Number |
Deliverable |
Lead Participant |
D1.1 |
Risk Management Plan |
OE |
D1.2 |
Data Management Plan |
OE |
D1.3 |
WP2 Design Review Summary Report and Comment Sheets |
OE |
D1.4 |
WP2 Implementation Plan and Deliverables for Go/No Go Submission |
OE |
D1.5 |
Construction Site Visit Report and Post Construction Report |
OE |
D1.6 |
System Integration Completion Certificate and Summary Report |
OE |
D1.7 |
Data Management Plan Update |
OE |
D2.1 |
Design Report for WEC Hull |
OE |
D2.2 |
Design Report for Turbine and Air Flow Control System |
OE |
D2.3 |
Design Report for Electrical Power System |
OE |
D2.4 |
Complete Design Report for Data Acquisition System |
OE |
D2.5 |
Design Report for Ancillary Systems |
OE |
D2.6 |
Design Report for Moorings & Umbilical System |
OE |
D2.7 |
Report on Site Consents and Insurance |
OE |
D2.8 |
Complete Environmental Monitoring Plan |
OE |
D2.9 |
Report with Marine Operations Plan |
OE |
D2.10 |
Report on the Plan for Commissioning and System Integration at Marshalling Site |
OE |
D2.11 |
Certification Plan |
OE |
D2.12 |
Techno-Economic Assessment, Business Plan and Plan to Financial Close |
OE |
D2.13 |
Overall Summary of Pre-procurement |
OE |
D3.1 |
Draft plan for the dissemination and exploitation of results |
University Of Exeter |
D4.1 |
Testing of PTO system completed at IEE laboratory |
Fraunhofer |
D4.2 |
Digital twin of the OE device system and licencing model ready for integration into |
Fraunhofer |
|
`planning tools for future external use |
|
D4.3 |
Completed OE35 hull delivered to the Marshalling Site |
Fraunhofer |
D4.4 |
Completed Turbine and Air Flow Control System delivered to the Marshalling Site |
Fraunhofer |
D4.5 |
Complete electrical power system delivered to the Marshalling Site |
Fraunhofer |
D4.6 |
Report on the testing of the Mooring Tether |
Fraunhofer |
D5.1 |
Deployment Plan/Method Statement for Operations |
OE |
D5.2 |
Moorings and Umbilical installation operations report |
OE |
D5.3 |
Post Install WEC Commissioning Report |
OE |
D5.4 |
Decommissioning Report |
OE |
D6.1 |
Routine Inspection Reports |
Green Marine |
D6.2 |
Routine Maintenance Reports |
Green Marine |
D6.3 |
Report on Operational Limits and Access Methods |
Green Marine |
D6.4 |
Report on Tether replacement operations |
Green Marine |
D6.5 |
Health and Safety Procedures report. |
Green Marine |
D7.1 |
Airborne And Underwater OE Technology Signature Report |
European Marine Energy Centre |
D7.2 |
OE Technology Ecological Impact Report: Year 1 and Year 2 |
European Marine Energy Centre |
D7.3 |
Environmental monitoring system design and performance analysis |
European Marine Energy Centre |
D7.4 |
Results of seabird surveys and observations. |
European Marine Energy Centre |
D7.5 |
Overall Environmental Monitoring Analysis and Report |
European Marine Energy Centre |
D8.1 |
Power Performance Assessment test report (IEC RETR) |
UCC |
D8.2 |
Verification report of mooring system |
UCC |
D8.3 |
Assessment report for availability, reliability and operations |
UCC |
D8.4 |
Report on contribution to International Standards |
UCC |
D9.1 |
Report on Operations Modelling |
Innosea |
D9.2 |
Completion of Certification Plan |
Innosea |
D9.3 |
Report on the Potential for Cost Reductions |
Innosea |
D9.4 |
Report on the Potential for LCOE Reductions |
Innosea |
D9.5 |
Report with Designs and costings for future array deployments to achieve utility scale installation |
Innosea |
D9.6 |
Report on Commercialisation Opportunities and other markets |
Innosea |
D10.1 |
Information Brochures |
University Of Exeter |
D10.2 |
Related scientific and technological articles |
University Of Exeter |
D10.3 |
For each asset/result, presentation “Pitch for investors” |
University Of Exeter |
D10.4 |
Final Exploitation Plan |
University Of Exeter |